Electric Rates as of 12-19-2019
RESIDENTIAL |
Service Charge: $14.50 per month |
Demand: None |
Energy Charge: $.096 per kwh |
(Plus Fuel Cost Adjustment)
COMMERCIAL |
Service Charge: $25.00 for Single phase |
$35.00 for 3 phase Demand: $9.00 per kwh |
Energy Charge: $.081 per kwh |
Large Power: (Industrial) |
Service Charge: $100.00 per month |
Demand: $20.00 per kwh |
Kvar: $1.00 per Kvar |
Energy Charge: $.039 per kwh |
(Plus or minus power cost factors.)
KWH TAX: |
0 – 2000 $0.004650 |
2001 – 15000 $0.004190 |
15001 and Over $0.003630 |
Codified Ordinance on Electric Rate
WATER RATES AS OF 12-1-2023 |
RESIDENTIAL, COMMERCIAL, and INDUSTRIAL |
Volume of water per month Rate for each 100cf |
0 through 200 $14.57 (minimum) outside: $21.86 |
201 through 1300 $ 6.45 outside: $9.67 |
1301 through 6100 $ 5.37 outside: $8.05 |
6101 through 22800 $ 4.37 outside: $6.55 |
22801 and Over $ 3.75 outside: $5.91 |
Multiple service rate |
0 through 200 $14.57 (minimum) |
201 and Over $5.94 |
MEGA Industrial |
0 through 200 $14.57 (minimum) |
201 through 1300 $6.14 |
1301 through 6100 $5.10 |
6101 through 22800 $4.16 |
22801 through 700000 $3.75 |
700001 and Over $2.91 |
Divide gallons by 7.48 for cubic foot conversion
Codified Ordinance on Water Rates
SEWER RATES 4-01-2024 |
RESIDENTIAL MINIMUM $16.81 (FIRST 200 CU FT) |
COMMERCIAL MINIMUM $16.81 (FIRST 200 CU FT) |
OUTSIDE RESIDENTIAL MINIMUM $21.01 (FIRST 200 CU FT) |
OUTSIDE COMMERCIAL MINIMUM $21.01 (FIRST 200 CU FT) |
INDUSTRIAL MINIMUM $16.81 (FIRST 200 CU FT) |
MEGA INDUSTRIAL: MINIMUM $16.81 (FIRST 200 CU FT) $ 4.92 (201 CU FT – 7000 CU FT) $ 4.19 (OVER 7001 CU FT) |
COUNTY (EASTLAKE/TWIN LAKES): $ .95 (PER 100 CU FT) |
Long Term Control Plan Fee |
Residential: $20.00 per month |
Commercial: $40.00 per month |
Industrial: $80.00 per month |
REFUSE RATES: |
RESIDENTIAL: MONTHLY CHARGE: $13.00 LANDFILL MONITOR: $3.00 |
TOTES: ONE TIME FEE $68.00 ADD’L MONTHLY CHARGE $16.00 |
Codified Ordinance on Sewer Rates