Electric Rates as of 12-19-2019           

 

RESIDENTIAL
Service Charge:               $14.50 per month
Demand:                                None
Energy Charge:               $.096 per kwh

 

(Plus Fuel Cost Adjustment)

 

        COMMERCIAL 
Service Charge:          $25.00 for 2 phase

                                      $35.00 for 3 phase

Demand:                      $9.00 per kwh

Energy Charge:          $.081 per kwh

 

 

 

    Large Power:  (Industrial)  
Service Charge:         $100.00  per month
Demand:                    $20.00  per kwh
Kvar:                           $1.00  per Kvar
Energy Charge:          $.039 per kwh

 

(Plus or minus power cost factors.)    

 

Codified Ordinance on Electric Rate                      

 

WATER RATES AS OF 12-1-2022
For all classes of service except multiple service 
 Volume of water per month                        Rate for each 100cf    
0 through 200                                    $13.88 (minimum)  outside: $20.82
201 through 1300                              $ 6.14                     outside: $9.21
1301 through 6100                            $ 5.11                     outside: $7.67
6101 through 22800                          $ 4.16                     outside: $6.24
all over 22800                                     $ 3.57                     outside: $5.63

 

 

 

Multiple service rate 
 0 through 200                 $13.88 (minimum)
 all over 200                      $5.66

 

Codified Ordinance on Water Rates

 

SEWER RATES   1-01-2023

RESIDENTIAL 

MINIMUM    $16.24       (FIRST 200 CU FT)
$  4.75   (PER EACH ADDITIONAL 100CU FT)

COMMERCIAL 

MINIMUM    $16.24       (FIRST 200 CU FT)
$  5.10     (PER EACH ADDITIONAL 100 CU FT)

OUTSIDE RESIDENTIAL

MINIMUM    $20.30      (FIRST 200 CU FT)
$  5.93     (PER EACH ADDITIONAL 100 CU FT)

OUTSIDE COMMERCIAL 

MINIMUM    $20.30       (FIRST 200 CU FT)
$  6.38     (PER EACH ADDITIONAL 100 CU FT)

INDUSTRIAL 

MINIMUM    $16.24      (FIRST 200 CU FT)
$  4.75     (PER EACH ADDITIONAL 100 CU FT)

MEGA INDUSTRIAL:         

MINIMUM    $16.24      (FIRST 200 CU FT)

$  4.75     (201 CU FT – 7000 CU FT)

$  4.05     (OVER 7001 CU FT)

 

 

 

COUNTY (EASTLAKE/TWIN LAKES):            $   .95        (PER 100 CU FT)

 

 

 

Long Term Control Plan Fee
Residential:     $20.00 per month
Commercial:    $40.00 per month
 Industrial:       $80.00 per month

 

 

REFUSE RATES:

RESIDENTIAL:

MONTHLY CHARGE:                                    $13.00

LANDFILL MONITOR:                                   $3.00

TOTES:

ONE TIME FEE                                              $68.00

ADD’L MONTHLY CHARGE                        $16.00 

 

Codified Ordinance on Sewer Rates